District Wide Water Quality Management Plan

Date Updated
Resource Type
Publications
Resource Category
Water Quality
Water Quantity

Prepared July 2019
Accepted by EPA March 2020
Due to its size, the District Wide Water Quality Management Plan (WQMP) appears in multiple sections (Parts 1-3 JEO Consulting)

Appendix F to the WQMP: Lake Hastings Watershed Implementation Plan
Prepared in May 2024
Accepted by EPA September 2024

Implementation Phase
This page includes additional studies, photos, and video footage produced after the WQMP was finalized.  These files support the implementation phase of the WQMP. These include the Water Quality Study by Flatwater Group (2024), low water photos and videos by Upper Big Blue NRD (2025), and the Sediment Retention Project 75% Design by EA Engineering, Science, and Technology (2026).